stomwerk tools
stomwerk projekt · free edition

Change Control Log

One controlled route for scope, cost and schedule change — with threshold-based escalation.

Runs in your browser. Nothing is uploaded or saved to a server — your answers stay on this device. Sign in to save runs, add an AI improvement plan and export Excel →

Log each change with its cost and schedule impact. The route (PM / Director / Steering) is set automatically from escalation thresholds, and the dashboard shows value at stake and what is stuck.

RefDescriptionTypeCost (€)Schedule (d)StatusRoute
PM
Director
2 change
Overall
100%
Under control

Change is flowing through a controlled route. Keep escalations (red rows) moving and stop open changes ageing past their assessment SLA.

2 change entered

Changes
2
Value at stake
€698,000
Escalations
1
Director / Steering
Open
2
Export & actions
Want the full instrument?

The full edition inside the stomwerk platform saves every run, generates a prioritised AI improvement plan, exports a formatted Excel workbook, and (with a stomwerk engagement) adds calibrated criteria and multi-assessor analysis.

Full edition: /t/change-control-log