Schedule Health Check
Pressure-test a P6 schedule by hand — logic, float, durations and progress integrity.
Enter the key activities with their duration, progress, total float and logic (predecessor/successor counts). Each row is health-checked for open ends, negative float and over-long durations, and the dashboard scores the schedule's logical integrity.
| Activity | Type | Duration (d) | % done (%) | Total float (d) | Preds | Succs | Health | |
|---|---|---|---|---|---|---|---|---|
| OK | ||||||||
| Long (>44d) | ||||||||
| Open end |
Too many open ends or negative float — the critical path and forecast dates are not trustworthy. Fix the logic before the schedule drives decisions.
3 activity entered
The full edition inside the stomwerk platform saves every run, generates a prioritised AI improvement plan, exports a formatted Excel workbook, and (with a stomwerk engagement) adds calibrated criteria and multi-assessor analysis.
Full edition: /t/schedule-viewer